Home
|
About Us
|
Certificate
|
News
|
Engineering Project
|
Join Us
|
Contact Us
Thermal power generation
Biomass power generation
Waste incineration power
Waste heat and waste gas
Gas turbine combined
Other power
Current Events
Signing Ceremony of PARMONANGAN II 2X5.5MW Hydroelectric Project, Indonesia
2021-8-5
PARMONANGAN 2X4.5MW Hydroelectric Project, Indonesia has completed successfully for operation.
2021-8-5
Tong shan Xin hui Boiler Coal to Gas technological transformation project has entered the stage of Preheating
2021-8-5
GOOD NEWS Successful Burning of 1X85t/g Boiler with Only One Ignition in Fuzhiyuan, Dongguan,China (Wilmar Group)
2021-8-5
Ruitai technical Co., Ltd. 2x30t/h boiler optimization project Ningxia,China has completed successfully for operation.
2021-8-5
Anniversary and Exchange Meeting with CR Gas Xuzhou Tongshan Xinhui Electric Co., Ltd. on Coal to Gas Boiler Technology Transformation Project
2021-8-5
Good news! North Sumatra-Indonesia PARMONANGAN II 2 X 5MW Hydropower Project successfully connected to the grid!
2021-8-5
共
7
条 第
1
/1
页
8
条/页 首页 上一页 下一页 尾页 转到:
第1页
Copyright @ 2012 JiangSu Ctp Power Co.,Ltd All Rights Reserved. ICP121254545